Road and lane closures in the W3 area likely to lead to traffic problems
The following roadworks are likely to cause some delays in the Acton area:
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
A406 Gunnersbury Avenue, Ealing |
19 March — 20 March |
Delays likely Traffic control (two-way signals) |
Works description: CARRIAGEWAY PATCHING REPAIRS |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430366492 |
|
Avenue Road, Acton |
18 March — 22 March |
Delays likely Road closure |
Works description: new customer water supplu 1x63mm unmtd BP Bulk P1-38+L/L(Conn), works inthe footway and in Carriageway. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU30700080604579-001001 |
|
B4491,A4000 Gunnersbury Lane, Acton |
20 March — 20 March |
Delays likely Traffic control (two-way signals) |
Works description: Install Thames Water pressure monitoring point |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU277PEALNG58/01 |
|
B4491 Popes Lane, Ealing |
18 March — 24 May |
Delays likely Traffic control (multi-way signals) |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP705S30001052 |
|
B490 Acton Lane, Acton |
18 March — 21 March |
Delays likely Traffic control (multi-way signals) |
Works description: JOINT HOLE AND TRENCH TO BOUNDARY FOR NEW SUPPLY |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002708 |
|
B490 Acton Lane, Acton |
18 March — 24 March |
Delays likely Traffic control (multi-way signals) |
Works description: This permit is for Thames Water to carry out 2x25mm MDPE mtrd Supply Existing Domestic - Conversion from 1 House into 3 flats |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000808402520045-001 |
A4000,A40 Western Avenue, Acton |
18 March — 28 September |
Delays likely Road closure |
Works description: IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432331357 |
|
Westway |
18 March — 18 November |
Delays likely Road closure |
Works description: IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432368104 |
|
Westway |
18 March — 18 November |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432366318 |
|
Westway |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432364637 |
|
Church Road, Acton |
06 March — 19 March |
Delays likely Road closure |
Works description: Excavate in footway. Carry out road crossing. Trench to site boundary. Backfill and reinstate. |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001861 |
|
A406 Gunnersbury Avenue (north Circular Road) |
15 March — 29 March |
Delays likely Lane closure |
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM 24/7 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG400402049 |
Friars Place Lane, Acton |
18 February — 04 April |
Delays likely Road closure |
Works description: IMGA192353. Replace approximately 400m of 600mm Medium Pressure SteelGas Main with new Plastic main. Including 2 connections and 2 excavations for bond and bolt camera surveys. |
Responsibility for works: Cadent |
Current status: Advanced planning |
Works reference: AZ0071000772458 |
Westway, Hammersmith and Fulham |
27 February — 22 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
A4000,A40 Western Avenue, Acton |
28 January — 29 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432329945 |
|
Westway |
28 January — 29 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432329946 |
|
A406 Gunnersbury Avenue (North Circular Road) |
21 January — 19 March |
Delays likely Contra-flow |
Works description: Phase 1a - 1f Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432343386 |