The following roadworks are likely to cause some delays in the Acton area:
Hammersmith Bridge to Close for Four Days
Cars diverted and bus routes shortened for repairs ahead of major refurbishment -Monday 20 August until Thursday 23 August
Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
Churchfield Road, Acton |
21 August — 24 August |
Delays likely Traffic control (Stop/Go boards) |
Works description: Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 1m of 2 poly ducts in Footway,Install 4m of 1 way poly duct in Carriageway,Install 4m of 1 way poly duct in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500265637200 |
A4000,A4020 High Street, Acton |
20 August — 29 August |
Delays likely Traffic control (multi-way signals) |
Works description: Permit for TM associated to LP551-S30001814 works. NIL EXCAVATION |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001968 |
|
A4020 Uxbridge Road, Acton |
20 August — 29 August |
Delays likely Traffic control (multi-way signals) |
Works description: for traffic light head only associated with LP551S30001814 |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001969 |
|
B4491,A4000 Gunnersbury Lane, Acton |
20 August — 29 August |
Delays likely Traffic control (multi-way signals) |
Works description: Excavate in footway for mains joint for new supply. Backfill & reinstate. |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001814 |
|
Churchfield Road, Acton |
21 August — 24 August |
Delays likely Traffic control (Stop/Go boards) |
Works description: Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 1m of 2 poly ducts in Footway,Install 4m of 1 way poly duct in Carriageway,Install 4m of 1 way poly duct in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500265637200 |
|
Kathleen Avenue, Acton |
20 August — 07 December |
Delays likely Road closure |
Works description: IMGA182032 - PERMIT FOR TM PURPOSES |
Responsibility for works: Cadent |
Current status: Advanced planning |
Works reference: AZ0071000721210 |
|
A406,A4005 Hanger Lane, Ealing |
23 August — 25 August |
Delays likely Traffic control (two-way signals) |
Works description: CARRIAGEWAY RESURFACING |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430321262 |
|
A406 Gunnersbury Avenue (north Circular Road) |
23 August — 25 August |
Delays likely Traffic control (two-way signals) |
Works description: CARRIAGEWAY RESURFACING |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430321314 |
|
A4000, A40 Western Avenue, Acton |
17 August — 28 August |
Delays likely Lane closure |
Works description: IMGA182036 TO UNDERTAKE TRIAL HOLES AND CAMERA SURVEYSTOESTABLISHTHELOCATION OF MAIN |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000742727 |
Rosemont Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000560 |
Lynton Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000559 |
|
Pierrepoint Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000555 |
|
B491 Southfield Road, Chiswick |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000541 |
A4000,A40 Western Avenue, Acton |
20 July — 19 November |
Delays likely Lane closure |
Works location: A4000,A40 |
Works description: EXCAVATE AND RENEW EXSISTING LV CABLES / SERVICES TRANSFER ALL TO NEW MAINS BACKFILL AND REINSTATE |
Responsibility for works: SCOTTISH AND SOUTHERN POWER DISTRIBUTION |
Current status: Advanced planning |
Works reference: LP705S30000466 |
Friary Road, Acton |
14 July — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, including some areas of carriageway reconstruction. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000535 |
Hillcrest Road, Ealing |
11 July — 18 September |
Delays likely Road closure |
Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT WITH DIRECTIONAL DRILLING |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H553/MEAS04/I001 |
Gunnersbury Avenue (North Circular Road) |
7 Jun 2017 - 16 Nov 2018 |
Delays likely Lane Closure |
Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west. |
Responsibility for works: Transport For London |
Current status: Work in progress |
Info supplied by roadworks.org August 22, 2018
|