Road and lane closures in the W3 area
The following roadworks are likely to cause some delays in the Acton area:
Hammersmith Bridge to Close for Four Days
Cars diverted and bus routes shortened for repairs ahead of major refurbishment -Monday 20 August until Thursday 23 August
Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
A4000,A4020 High Street, Acton |
14 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005OP1W00000IBUL4VVM01 |
|
A4020 Uxbridge Road, Acton |
14 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005OP1W00000IBUL4VVM02 |
|
A406 Gunnersbury Avenue, Ealing |
14 August — 15 August |
Delays likely Traffic control (two-way signals) |
Works description: SEW DESCALE EMERGENCY/REACTIVE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141DLTW--000002 |
|
B4491,A4000 Gunnersbury Lane, Acton |
13 August — 15 August |
Delays likely Traffic control (two-way signals) |
Works description: Non Excavation - 2 way lights to allow for cherry picker to sit in and access telecoms mast to carry out repair works. footpath closure and pedwalk supplied. The cherry Picker will only be for one day which will be 13/08/2018 |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX04188489/POLE/RTS/LB |
|
B4491, A4000 Gunnersbury Lane, Acton |
14 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description: Aplant have advised me that they have copied the main lights head for head and there should be no issues with the pedestrian crossing |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005OP1W0000000IBUL4VVM |
|
A4000,A40 Western Avenue, Acton |
16 August — 18 August |
Delays likely Lane closure |
Works location: Unknown |
Works description: Maintenance of Average Speed system |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG53014000570 |
|
|
B408 Askew Road |
16 August — 19 August |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: Lay duct and install tee for customer connection. |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJFI/97394/LSME |
|
A4000, A40 Western Avenue, Acton |
13 August — 16 August |
Delays likely Lane closure |
Works description:CARRIAGEWAY RESURFACING AND GULLY REPAIR |
Responsibility for works:Transport for London |
Current status:Planned work about to start |
Works reference:YG430318502 |
|
A4000, A40 Western Avenue, Acton |
13 August — 16 August |
Delays likely Road closure |
Works description:Carriageway Resurfacing- Full Road Closure (Westbound) TMAN: N1801703 |
Responsibility for works:Transport for London |
Current status:Advanced planning |
Works reference:YG432304422 |
|
A4000, A40 Western Avenue, Acton |
13 August — 17 August |
Delays likely Lane closure |
Works description:Access required to Underground BT structure allowing BT Openreach provide multiple customers service - No structural changes. Work being carried out on existing BT Plant between Alliance Rd Concord Rd and Kendal Avenue under agreed in TFL Ref W18-0537 Lane 1 Closure Westbound BT Openreach on site contacts will be Mark Maloret 07740 009 168 and Chris Eley 07740 739 092 |
Responsibility for works:Openreach |
Current status:Planned work about to start |
Works reference:BC005CC1W0IBR3PLVCJULY01 |
|
A4020 Uxbridge Road, Acton |
14 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works description:Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM |
Responsibility for works:Openreach |
Current status:Planned work about to start |
Works reference:BC005OP1W00000IBUL4VVM02 |
|
Pierrepoint Road, Acton |
13 August — 08 September |
Delays likely Road closure |
Works description:Carriageway resurfacing, |
Responsibility for works:Ealing |
Current status:Planned work about to start |
Works reference:DV00665000555 |
|
St Andrews Road, Acton |
13 August — 18 August |
Delays likely Road closure |
Works description:new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase |
Responsibility for works:THAMES WATER |
Current status:Planned work about to start |
Works reference:MU307000807492140045-001 |
|
Westway |
13 August — 16 August |
Delays likely Lane closure |
Works description:Taper for Full Road Closure (westbound) TMAN: N1801703 |
Responsibility for works:Transport for London |
Current status:Advanced planning |
Works reference:YG432304428 |
|
Rosemont Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000560 |
Lynton Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000559 |
|
Pierrepoint Road, Acton |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000555 |
|
B491 Southfield Road, Chiswick |
01 August — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000541 |
A4000,A40 Western Avenue, Acton |
20 July — 19 November |
Delays likely Lane closure |
Works location: A4000,A40 |
Works description: EXCAVATE AND RENEW EXSISTING LV CABLES / SERVICES TRANSFER ALL TO NEW MAINS BACKFILL AND REINSTATE |
Responsibility for works: SCOTTISH AND SOUTHERN POWER DISTRIBUTION |
Current status: Advanced planning |
Works reference: LP705S30000466 |
Friary Road, Acton |
14 July — 31 October |
Delays likely Road closure |
Works description: Carriageway resurfacing, including some areas of carriageway reconstruction. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000535 |
Hillcrest Road, Ealing |
11 July — 18 September |
Delays likely Road closure |
Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT WITH DIRECTIONAL DRILLING |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H553/MEAS04/I001 |
Gunnersbury Avenue (North Circular Road) |
7 Jun 2017 - 16 Nov 2018 |
Delays likely Lane Closure |
Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west. |
Responsibility for works: Transport For London |
Current status: Work in progress |
Info supplied by roadworks.org August 15, 2018
|