Road and lane closures in the W3 area
The following roadworks are likely to cause some delays in the Acton area:
Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
B4491,A4000 Gunnersbury Lane, Acton |
13 July — 16 July |
Delays likely Road closure |
Works description: Road closure for Lovebox/Citadel Festival from evening of Friday 13th July to midnight 15th July. Access maintained for residents. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00866000216 |
|
B4491 Popes Lane, Ealing |
13 July — 16 July |
Delays likely Road closure |
Works description: Road closure for Lovebox/Citadel Festival from evening of Friday 13th July to midnight 15th July. Access maintained for residents. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00866000215 |
|
Friary Road, Acton |
14 July — 31 October |
Delays likely Road closure |
Works location: Unknown |
Works description: Carriageway resurfacing, including some areas of carriageway reconstruction. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000535 |
A406 Gunnersbury Avenue (North Circular Road) |
12 July — 14 July |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: HCV Valve checks in the carriageway. Chamber opening only. Non excavation |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600HCV6931955 |
B4491,A4000 Gunnersbury Lane, Acton |
12 July — 14 July |
Delays likely Lane closure |
Works location: Unknown |
Works description: HCV Valve checks in the carriageway. Chamber opening only. Non excavation |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600HCV6944059 |
A4000,A40 Western Avenue, Acton |
11 July — 13 July |
Delays likely Lane closure |
Works description: CARRAIGEWAY PATCHES |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430311953 |
Hillcrest Road, Ealing |
11 July — 18 September |
Delays likely Road closure |
Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT WITH DIRECTIONAL DRILLING |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H553/MEAS04/I001 |
Gunnersbury Avenue (North Circular Road) |
7 Jun 2017 - 16 Nov 2018 |
Delays likely Lane Closure |
Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west. |
Responsibility for works: Transport For London |
Current status: Work in progress |
Info supplied by roadworks.org July 13, 2018
|