The following roadworks are likely to cause some delays in the Acton area:

A4000 Wales Farm Road, Acton
27 July — 28 July
Delays likely Lane closure
Works location: A4000
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Planned work about to start
A4000 Wales Farm Road, Acton
27 July — 28 July
Delays likely Lane closure
Works location: A4000
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Planned work about to start
A406,A4005 Hanger Lane, Ealing
27 July — 28 July
Delays likely Traffic control (multi-way signals)
Works location: A406,A4005
Works description: Working On Behalf Of Thames Water To Carry Out Cctv Of The Sewers.
Responsibility for works: Thames Water
Current status: Planned work about to start
Horn Lane, Acton
24 July — 04 September
Delays likely Traffic control (multi-way signals)
Works location: -
Works description: -
Responsibility for works: Ealing London Borough Council
Current status: Planned work about to start
The Vale, Acton
25 July — 03 August
Delays likely Traffic control (two-way signals)
Works location: -
Works description: -
Responsibility for works: Fulcrum Pipelines Limited
Current status: Planned work about to start

Gunnersbury Avenue (North Circular Road)

07 June — 16 November 2018

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start