The following roadworks are likely to cause some delays in the Acton area:

Roadworks in Acton

High Street, Acton

10 April — 18 April

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

Acton Lane, Chiswick

11 April — 12 April

Delays likely Road closure

Works location: Bridge (Rail Over Road) No 11...

Works description: Detailed Examination Of Rail Over Road Bridge, Between The Hours Of 22.00-06.00...

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Advanced planning

Wales Farm Road, Acton

11 April — 13 April

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Gunnersbury Lane, Acton

12 April — 20 April

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

Uxbridge Road, Ealing

12 April — 12 April

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

Western Avenue, Acton

13 April — 14 April

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

Western Avenue, Acton

13 April — 14 April

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Advanced planning

Horn Lane, Acton

03 April — 12 May

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: Ealing London Borough Council

Current status: Advanced planning

Wolverton Gardens

03 April — 09 June

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: National Grid Gas Distribution

Current status: Planned work about to start

Gunnersbury Avenue (North Circular Road)

31 March — 13 May

Delays likely Contra-flow

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

 

Info supplied by roadworks.org